Engineering Better Building Services
+44 (0)1274 691177

Case Studies

Carlsberg green bottles

Bottling Quality At The New Carlsberg Plant

A bottling facility opened recently on the Northampton site of one of the world’s biggest brewers includes a suite of systems designed and installed by the Mitton team. The development forms part of a £60M investment at the brewery’s River Nene site, part of the new Northampton Enterprise Zone, and the mechanical package installed by Mitton covers heating, ventilation, air conditioning, and domestic water. Read more

Heating Up The Fire Service!

The Fire Service station at Fairweather Green in Bradford now has a new heating system serving the whole of the building, following a full boiler replacement project carried out by the Mitton team to replace outdated equipment with new, efficient plant. Read more

Warming The Heart Of The Huddersfield Campus…

Serving some 24,000 students, Huddersfield University prides itself upon its reputation in the academic world. The institution is within the top ten in England for considerations including teaching excellence, and both UK and international student satisfaction, as well as for its estates and facilities. Read more

All Systems Go At Farmers Boy

Originally designed and built in 1998, the Farmers Boy fresh food factory in Bradford is currently being extended to house new state of the art automated quiche production lines, with the addition of a new three bay extension at the south end of the building. Read more

© Copyright 2018 Mitton Group